2 flat. Finish remodeling work is required, seller has done all of the dirty work. New windows just installed, inside rough framing done outside removal of all of the old siding and new insulation done. Separate gas meters and electric. Sewer lateral replaced in 2016 to this house
307 E Jefferson St, Stoughton, WI 53589
2 flat. Finish remodeling work is required, seller has done all of the dirty work. New windows just installed, inside rough framing done outside removal of all of the old siding and new insulation done. Separate gas meters and electric. Sewer lateral replaced in 2016 to this house